99精品视频免费热播在线观看丨无码国产成人午夜视频在线播放丨97碰碰碰免费公开在线视频丨成a人片亚洲日本久久丨欧洲精品卡1区2卡三卡四卡

Welcome to Hashimoto Precision Metal (Shenzhen) Ltd

Mailbox:

info@hskcoltd.com

Hashimoto Precision Metal (Shenzhen) Ltd

Specialize in precision stamping parts since 1935
News
Your position: Home > News > Industry news > Why choose stamping

Contact us

Hashimoto Precision Metal (Shenzhen) Ltd

Address: No. 25, Xinfa East Road, Xiangshan Community, Xinqiao street, Bao'an District, Shenzhen 518125, P.R.China

Tel: +86-755-27267875

Email: info@hskcoltd.com

Industry news

Why choose stamping
Release time:2022-07-11Views:2213


There are various ways of metal processing. If the volume is large and the accuracy requirement is relatively high, stamping will be selected. Stamping products are stable in dimension, light in weight, and have good surface condition and accuracy. As they depend on punches and molds, the production cycle is long and initial mold investment is large. There are three common types of stamping dies:

1)Single punching die: in one stroke of stamping, only one process can be completed, generally manual feeding

2)Continuous die: it is also translated as "progressive die". Two or more stamping processes are completed at the same time during one stroke of stamping

3)Composite mold: multiple materials are carried out simultaneously or multiple processes are conducted at the same time.


When the quantity of mass production is not large or the product has not been finalized, the early trial will be completed by prototype or single die, which can be at a lower cost. When the shape and specific dimensions of the product have been verified and can be batched, continuous die or composite die will be used. Because there will be a gap between theory and practice, the yield of raw materials and the matching degree of mold parts are not equal to the actual value. "Prank" action in the early mold trial stage is to find out the differences between the design and practice, repair or remake parts, in order to make the quality of the products completely consistent with the requirements of the drawings.


This cycle is determined according to the difficulty of the product. It can be done quickly at one time, whereas sometimes the mold in the R & D stage will take half a month or even more. This process is like the process of cocoon stripping, which is also like go see a doctor. In the eyes of the mold repairman, every steel plate has life. Under the skillful hands of punching, rubbing, grinding and knocking, each part can achieve the best clearance. By cooperating with each other, a satisfactory finished product can finally be produced.

Inquire Now * required
Submit
主站蜘蛛池模板: 粗大的内捧猛烈进出| 中文在线8资源库| 成年免费视频播放网站推荐| 免费人成网站在线观看不| 国产成人精品一区二区三区无码| 人妻无码全彩里番acg视频| 成人午夜亚洲精品无码网站| 少妇下面好紧好多水真爽播放| 好男人社区www在线官网| 7878成人国产在线观看| 欧美成人一区二区三区在线观看| 国产精品亚洲专区无码影院| 加勒比久久综合网天天| 草草影院发布页| 久久婷婷五月综合色中文字幕| 先锋影音xfyy5566男人资源 | 国产乱人伦精品一区二区在线观看| 影音先锋人妻av在线电影| 成人小说亚洲一区二区三区| 久久天天躁狠狠躁夜夜婷| 国产精品内射视频免费| 又粗又硬又大又爽免费视频播放 | 成熟了的熟妇毛茸茸| 国产亚洲精品久久久久9999| 国产成人精品无码一区二区老年人 | 久久不见久久见免费影院小说| 午夜理论欧美理论片| 亚洲色大成网站www| 伴郎粗大的内捧猛烈进出视频观看 | 亚洲香蕉伊综合在人在线观看| 欧美国产成人精品一区二区三区| 亚洲国产熟妇在线视频| 久久国产精品免费一区二区三区 | 中日韩产精品1卡二卡三卡| 大肉大捧一进一出好爽| 尹人香蕉久久99天天拍久女久| 五月综合激情婷婷六月色窝| 少妇无套内谢久久久久| 东京热无码一区二区三区av | av无码一区二区二三区1区6区| 日韩人妻ol丝袜av一二区|